Feltham Re-signalling Programme
The project
The Feltham Re-signalling area covers over 500 life-expired assets on a key commuter route into London. This route has seen a dramatic increase in use over recent years, with over 1.2 million annual journeys now, compared to only 700K ten years ago. The Feltham area signalling dated from 1974 and, as such, had become outdated. Re-signalling had already been deferred, and the asset condition was such that further deferment was not an option.
Enable Design (formerly known as Equate Design) was contracted to support the design of the full civil engineering scope of works for the Feltham Re-signalling Project Phases 1, 2 and 5. This multi-disciplinary project covers over 60 track miles in total.
The Objective
The civils scope relating to the works forms part of a series of projects for the Feltham re-signalling programme. As part of this, Enable Design has had to support the introduction of a new signalling system across South-West London, covering level-crossings, depots, and station & trackside civils works. Over 350 separate civils assets will need to be constructed and completed inline with the overall programme, so that signalling upgrades can proceed and resultant benefits to passengers can be realised.
The challenge
The sheer geographic spread of the project, the number and variety of assets, and the limited access to the railway have resulted in a logistical challenge for programme, resource and management across the project.
The Team
- Engineering Manager
- Design Manager
- Project Manager
- Survey Engineers
- Civil Engineers
- Surveyors
The solution
Enable Design has deployed a multi-disciplinary workforce, including rail, civil and structural design expertise, along with in-house project management who have previously delivered time-pressurised re-signalling schemes. This experienced team hasprovided an effective and efficient delivery solution, enabling us to complete all works so far to the client’s requirements. Our tight hold on the programme and highly collaborative relationship with Network Rail have enabled us to deliver ahead of programme, providing benefits to all parties. Furthermore, our detailed understanding of the possession planning process has enabled us to develop a highly efficient track access strategy that ensures minimal disruption to the operational railway and travelling public.
The deliverables
- As well as providing Engineering and Project Management services, Enable Design also produced a range of surveys and designs across the project covering the following assets:
- Under Track Crossings (UTXs)
- Under Road Crossings (URXs)
- Piled foundations and concrete pad foundations for equipment housings
- Piled foundations and concrete pad foundations for signals and lineside equipment
- Signal posts & gantries
- Lineside cable routes, including ducted routes through platforms
- Ballast boarding and earth-retaining walls
- Laydown areas and walkways
- Temporary works designs
- Setting out and post-installation track monitoring
Gallery
Find out how we can help you
If we can help you in any way, please do get in touch. In order that we can assist you efficiently, please click on the link below. Alternatively, you can call us on 020 4566 9616.
Get in Touch